About Us
PIPELINES

AHA has experience in the construction and installation of pipelines in a range of materials & sizes. From 80mm diameter polyethylene to 1100mm Mild steel, we are competent in various construction techniques including directional drilling, slip-lining, above ground installations, and below ground installations in difficult ground conditions.

Stainless Steel 500mm Main, Moe

Stainless Steel Pipeline


Directional Drilling 450mm PE Main, Kew

Kew Directional Drilling

150mm PVC, Melbourne Convention centre

Exhibition Centre


PRESSURE REDUCING STATIONS

AHA has constructed pressure reducing facilities for Yarra Valley Water, South East Water & Barwon Water. From above ground units, to dual buried stations, and stations located in difficult areas, AHA draws on its past experience to deliver assets that often exceed clients expectations.

Click here to refer to our Case Studies pages

Eltham PRV, Yarra Valley Water

Eltham PRV

Recycled Water PRV, Aurora (Solar powered)

Recycled Water PRV

Waverley PRV, Yarra Valley Water

Waverly PRV

PUMPING STATIONS

AHA Constructions has constructed both water & waste water pumping stations for Barwon water, Yarra Valley Water, & the City of Kingston. Examples of the types of projects AHA has undertaken include:

• Above ground high level pump stations
• Recycled water pump stations, both with & without chemical dosing
• Changeover of submersible sewer pumps with bypass pumping in place
• Deep pump wells in difficult ground conditions
• Complete pump station upgrades within strict time frames
• Full upgrades of critical water pump stations, whilst maintaining flow throughout the construction phase

Aurora Recycled Water Pump Station

Aurora Pumping Station

Mt Aitken High Level Pump Station

Mt Aitken Pump Station

Mt Aitken Pump Station two

Click here to refer to our Case Studies pages

WATER TREATMENT AND SPECIALTY WORKS

AHA has extensive experience with mechanical & electrical installations of water treatment facilities and a variety of other water treatment systems. Some examples of this experience include:

• Chemical dosing
• Gross pollutant trap installations
• Step screens
• Screw wash presses

Terang Water Reclamation plant upgrade, Step screen & screw wash press

Terang Water Reclamation Plant

Sewer manhole inspections, Melbourne Water